10 articles with this tag
Track NVIDIA's data center GPU roadmap through Feynman, see how Rubin Ultra and Kyber plans changed, and choose rental terms around the annual cadence.
hardware / analysisNVIDIA says Vera Rubin production shipments began in August 2026. Compare dated specs, conflicting bandwidth figures, cloud plans and reported rack costs.
guides / hardwareChoose how to split a model across rented GPUs, calculate training memory, and match tensor, pipeline and data parallelism to NVLink and cluster networks.
hardware / pricingWhat a GB200 or GB300 NVL72 rack is, how it compares with an 8-GPU B300 server, sourced purchase-price estimates, and how to compare rental listings.
guides / hardwareVerify your rented GPU's model, memory, power, PCIe and NVLink, then check errors and run a short server stress test before committing to a long training job.
hardware / guidesInfiniBand and RoCE Ethernet both move GPU traffic between servers. See the generations, provider fabrics, and when a single GPU or node needs neither.
hardware / guidesFour NVIDIA cards carry the 6000 name. Tell them apart by full name, memory and NVLink, then compare their specs and live rental prices side by side.
hardware / guidesA is Ampere, L is Ada, H is Hopper, B is Blackwell. A decoder table, a generation timeline and a four-step method for placing any NVIDIA GPU on a rental site.
pricing / hardwareWhat an H100 card, an 8-GPU server and a DGX H100 last listed for, with sellers and dates, next to live rental prices and a break-even method you can run.
hardware / guidesNVLink, PCIe and SXM explained for people renting multi-GPU servers: bandwidth per generation, what the H100 NVL is, and when the SXM premium pays off.